L&A conducted the aquifer testing at the Ohio State University football
stadium as part of the $150 million remodeling project at the horseshoe.
The field was lowered about 17 feet to provide increased seating capacity
at the stadium. L&A installed a high capacity pumping well and several
observation wells to determine how much pumping would be required to
lower ground water levels to meet the demands of the new field.